Document Management

We provide complete technical documentation and data dossiers in the contractual language to complete the supply. Documentation supplied, depending on client request, may consist of:

  • Project Quality Plan
  • Inspection & Test Plan
  • Manufacturing and testing procedures
  • Welding procedure specifications (WPS)
  • Prequalification records (PQR)
  • NDT Reports
  • Material Test Certificate to DIN 50049 or EN 10204 type 2.1, 2.2, 2.3, 3.1, 3.2, (3.1b, 3.1c) according to client requirements. Each QC dossier is supplied with the number of copies stipulated in the contract.

Our Products

Premium Piping Materials

From engineering assistance to job-site delivery — we manage every link of your piping supply chain.

Material Treatments

Advanced coatings and precise processes ensure long-lasting, reliable components. United International Piping UK Ltd offers a comprehensive range of m...

Inspection and Testing

UPS has established a system which ensures the final product is in line with the customer requirements. All the stages affecting the product quality h...

Logistics

Material storage

Thanks to our efficient stock management for whi...

Fabrication

ASP is specialised in providing complete fabrication service. Our Engineering team is equipped with all the necessary software for providing fabricati...

Global United Integrators Pipes & Valves Trading LLC-SPC — dependable piping partner for EPCs across Middle East. Premium mills, engineering assistance, expediting & job-site logistics.

ISO 9001
API 6D
MTC TRACEABLE

Contact Us